Bouygues Travaux Publics est une entreprise du groupe Bouygues spécialisée dans les domaines de l’aménagement du territoire et la construction d’infrastructures.
Our Company:
At Bouygues Construction Australia, we’re dedicated to the design, construction,
finance and delivery of innovative projects across civil infrastructure, buildings and energy & services. As members of the Bouygues Construction group, a global network of more than 50,000 people working in over 80 countries, we’ve been working in Australia for more than 25 years.
We've delivered many successful projects to date, including the Sydney Airport Link (T2 Airport Line), NorthConnex or WestConnex 3A.
The T2D project consists of two tunnels linked by an open motorway. The southern tunnels will link Darlington to the Anzac motorway, while the northern tunnels will link Torrensville (Torrens River). The southern and northern tunnels will be linked by an open motorway.
Your missions:
1. Preparation of construction methods in coordination with production with focus on safety, program, and cost: overall construction staging, detailed work sequences and cycles, assembly or dismantling of equipment.
2. Review design drawings for constructability and compliance with execution methods.
3. Development of site establishment drawings including but not limited to identification of cribbing facilities, accesses for pedestrians and vehicles, layout of site equipment, utilities.
4. Identification, concept development and design management of temporary structures in coordination with temporary works engineer.
5. Identification and development of tools required to carry the works on site in coordination with production and plant teams: transport, excavation, lifting, formwork/concreting.
6. Interface with traffic management team in relation to staging of works and impact on public to meet client and stakeholders’ requirements.
7. Preparation of methods drawings on Autocad/Revit: drafting and draft person management.
8. Participate in technical/price studies for different construction solutions for the structure.
Alignment with Bouygues Construction Australia’s values:
- Listening to and satisfying the customer.
- An enterprising and professional approach.
- A sense of common interest and solidarity.
- Respect for people and for commitments.
The Methods Engineer will report to the Methods manager and work within a team of 15 people.